{"id":8162,"date":"2023-02-04T17:22:13","date_gmt":"2023-02-04T17:22:13","guid":{"rendered":"https:\/\/ugandaupdatenews.com\/?p=8162"},"modified":"2023-02-04T17:22:20","modified_gmt":"2023-02-04T17:22:20","slug":"ugandas-oil-journey-unoc-awarded-petroleum-exploration-license-to-begin-development-of-kasuruban-block","status":"publish","type":"post","link":"https:\/\/prowebinhost.com\/anzu\/ugandas-oil-journey-unoc-awarded-petroleum-exploration-license-to-begin-development-of-kasuruban-block\/","title":{"rendered":"<strong>Uganda\u2019s Oil Journey: UNOC awarded Petroleum Exploration License to begin Development of Kasuruban block<\/strong>"},"content":{"rendered":"\n<p><strong>By Sierra Ruth Arinaitwe<\/strong><\/p>\n\n\n\n<p>The Government of Uganda represented by the Ministry of Energy and Mineral Development has issued the Uganda National Oil Company (UNOC) a two-year Petroleum Exploration License for the development of the Kasuruban block.<\/p>\n\n\n\n<p>The license was issued to UNOC after signing of the Production Sharing Agreements (PSA) for Petroleum Exploration, Development and Production during a meeting presided over by the Minister of Energy and Mineral Development Hon. Ruth Nankabirwa. The signing was also witnessed by the Deputy Atoorney General Mr. Jackson Kafuuzi ,the Permanent Secretary Ministry Energy, Eng. Irene Batebe and officials the Petroleum Authority of Uganda.<\/p>\n\n\n\n<p>Hon. Nankabirwa stated that issuing of the license and signing of the production sharing agreement with UNOC followed the enactment of the required policy, legal and regulatory frameworks for the Oil and Gas sector which attests to government&#8217;s commitment to fulfil the objectives and principles of the National Oil and Gas policy.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"461\" height=\"1024\" data-attachment-id=\"8164\" data-permalink=\"https:\/\/prowebinhost.com\/anzu\/ugandas-oil-journey-unoc-awarded-petroleum-exploration-license-to-begin-development-of-kasuruban-block\/naka-3\/\" data-orig-file=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/02\/naka-scaled.jpg\" data-orig-size=\"1152,2560\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;1.89&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;TECNO CH9&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1675345077&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;5.5&quot;,&quot;iso&quot;:&quot;380&quot;,&quot;shutter_speed&quot;:&quot;0.030001&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"naka\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/02\/naka-scaled.jpg\" data-large-file=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/02\/naka-scaled.jpg\" src=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/02\/naka-461x1024.jpg\" alt=\"\" class=\"wp-image-8164\" srcset=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/02\/naka-scaled.jpg 461w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/02\/naka-scaled.jpg 135w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/02\/naka-scaled.jpg 768w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/02\/naka-scaled.jpg 691w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/02\/naka-scaled.jpg 922w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/02\/naka-scaled.jpg 1152w\" sizes=\"(max-width: 461px) 100vw, 461px\" \/><figcaption class=\"wp-element-caption\">Energy Minister making remarks at the signing of the PSA with UNOC at the Ministry &#8216;s head office in Kampala<\/figcaption><\/figure>\n\n\n\n<p>\u201cThe Government decided to implement open, transparent and competitive licensing rounds as required by the Petroleum (Exploration, Development and Production) Act, 2013,\u201d the Minister expailned while pointing out -that the awarding of the license and signing of the production sharing agreement gives a go ahead to UNOC to begin the exploration of the Kasuruban contract area which covers the districts of Bulisa, Hoima and Masindi with an acreage of 1285 Sq. Kilometers.<\/p>\n\n\n\n<p>According to the agreement, UNOC is expected to make some payments to the Uganda Petroleum Fund account which will be used to develop the contract area and fund other national projects like roads, extension of electricity supply among others.<\/p>\n\n\n\n<p>\u201cThe company has paid the required amount sum of USD 155,700 for the signature bonus, research and training fees, and annual Acreage rental fees for the Kasuruban Contract Area.\u201d<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"461\" data-attachment-id=\"8165\" data-permalink=\"https:\/\/prowebinhost.com\/anzu\/ugandas-oil-journey-unoc-awarded-petroleum-exploration-license-to-begin-development-of-kasuruban-block\/irene\/\" data-orig-file=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/02\/irene-scaled.jpg\" data-orig-size=\"2560,1152\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;1.89&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;TECNO CH9&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1675343599&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;5.5&quot;,&quot;iso&quot;:&quot;504&quot;,&quot;shutter_speed&quot;:&quot;0.030001&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;1&quot;}\" data-image-title=\"irene\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/02\/irene-scaled.jpg\" data-large-file=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/02\/irene-scaled.jpg\" src=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/02\/irene-1024x461.jpg\" alt=\"\" class=\"wp-image-8165\" srcset=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/02\/irene-scaled.jpg 1024w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/02\/irene-scaled.jpg 300w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/02\/irene-scaled.jpg 768w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/02\/irene-scaled.jpg 1536w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/02\/irene-scaled.jpg 2048w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/02\/irene-scaled.jpg 1600w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/02\/irene-scaled.jpg 2400w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption class=\"wp-element-caption\">PS Eng. Batebe said the second round of licensing was meant to widen the country&#8217;s resource base <\/figcaption><\/figure>\n\n\n\n<p>The Permanent Secretary Ministry of Energy and Mineral Development Ms. Irene Batebe said that the Second Licensing Round for Petroleum Exploration was implemented in order to attract additional investment in the country&#8217;s oil and gas sector, expand the country&#8217;s resource base, enhance the country&#8217;s sustainability of oil and gas production; and to respond to the numerous investors who expressed interest in investing in the country&#8217;s oil and gas industry.<\/p>\n\n\n\n<p>Eng. Betebe further stated that UNOC\u2019s exploration license is for two years and renewal for subsequent exploration periods will be subject to UNOC\u2019s acquiring joint venture partners to carry out its financial obligations for the exploration periods and satisfaction to government of the agreed work program obligations .<\/p>\n\n\n\n<p>The Chief Executive Officer of UNOC Proscovia Nabbanja noted that the company has a cardinal role to play in the oil value chain to ensure sustainable exploitation of the country\u2019s oil resources and pledged to ensure that they fulfil all the petroleum obligations of the contract area in accordance to the provided framework.<\/p>\n\n\n\n<p>Uganda National Oil Company is a company duly organized and existing under the laws of Uganda, and registered in Uganda under the Companies Act of 2012 as Uganda National Oil Company Limited (UNOC). UNOC is part of the Joint Venture Partners and carries State Participation of 15% in each of the Production Licenses issued to TotalEnergies EP Uganda BV and CNOOC Uganda Limited.<\/p>\n\n\n\n<p><strong>Editor:msserwanga@gmail.com<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>By Sierra Ruth Arinaitwe The Government of Uganda represented by the Ministry of Energy and Mineral Development has issued the<\/p>\n","protected":false},"author":1,"featured_media":8163,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[87,168],"tags":[],"class_list":["post-8162","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","category-national-development"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/02\/IMG_20230202_134922_809-scaled.jpg","jetpack-related-posts":[{"id":9008,"url":"https:\/\/prowebinhost.com\/anzu\/uganda-grants-new-petroleum-exploration-license-for-turaco-block-signs-addendum-for-the-kanywataba-production-sharing-agreement\/","url_meta":{"origin":8162,"position":0},"title":"Uganda grants new petroleum exploration license for Turaco Block, signs addendum for the Kanywataba production sharing agreement","author":"UgandaUpdate","date":"May 13, 2023","format":false,"excerpt":"By Our Energy and Oil sector Reporter Uganda has gone ahead to grant\u00a0 another petroleum exploration license for Turaco Block and signed an addendum for the Kanywataba production sharing agreement for petroleum exploration , development and production. The signing ceremony between the government of Uganda through the Ministry of Energy\u2026","rel":"","context":"In &quot;National News&quot;","block_context":{"text":"National News","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-news\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/05\/naka-scaled.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/05\/naka-scaled.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/05\/naka-scaled.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/05\/naka-scaled.jpg 2x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/05\/naka-scaled.jpg 3x"},"classes":[]},{"id":10336,"url":"https:\/\/prowebinhost.com\/anzu\/energy-minister-nankabirwa-says-uganda-on-track-to-produce-oil-by-2025\/","url_meta":{"origin":8162,"position":1},"title":"Energy Minister Nankabirwa says Uganda on track to produce oil by 2025","author":"UgandaUpdate","date":"October 29, 2023","format":false,"excerpt":"The government of Uganda is on track to ensure that the first drop of oil is produced by the end of 2025, the Minister of Energy and Mineral Development, Hon. Ruth Nankabirwa, has told parliament. \u201cGovernment and its partners are working tirelessly and I am happy to report that we\u2026","rel":"","context":"In &quot;National News&quot;","block_context":{"text":"National News","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-news\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/10\/The-Minister-of-Energy-and-Mineral-Development-Hon.-Ruth-Nankabirwa-speaking-during-the-plenary-sitting-on-Wednesday-25-October-2023.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/10\/The-Minister-of-Energy-and-Mineral-Development-Hon.-Ruth-Nankabirwa-speaking-during-the-plenary-sitting-on-Wednesday-25-October-2023.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/10\/The-Minister-of-Energy-and-Mineral-Development-Hon.-Ruth-Nankabirwa-speaking-during-the-plenary-sitting-on-Wednesday-25-October-2023.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/10\/The-Minister-of-Energy-and-Mineral-Development-Hon.-Ruth-Nankabirwa-speaking-during-the-plenary-sitting-on-Wednesday-25-October-2023.jpg 2x"},"classes":[]},{"id":4461,"url":"https:\/\/prowebinhost.com\/anzu\/uganda-on-course-to-get-its-first-oil-out-of-the-ground-in-2025-as-minister-nankabirwa-gives-updates-about-the-energy-sector\/","url_meta":{"origin":8162,"position":2},"title":"UGANDA ON COURSE TO GET ITS FIRST OIL OUT OF THE GROUND IN  2025 AS  MINISTER NANKABIRWA GIVES UPDATES ABOUT THE ENERGY SECTOR","author":"UgandaUpdate","date":"November 4, 2021","format":false,"excerpt":"By Sierra Ruth Arinaitwe The Minister of Energy and Mineral Development Hon. Ruth Nankabirwa Ssentamu has reassured the country that the oil and gas sector is making good strides towards Uganda getting its first oil out of the ground in 2025. Nankabirwa made the remarks at the Ministry\u00a0 head office\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/prowebinhost.com\/anzu\/category\/energy\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/11\/na-scaled.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/11\/na-scaled.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/11\/na-scaled.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/11\/na-scaled.jpg 2x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/11\/na-scaled.jpg 3x"},"classes":[]},{"id":10820,"url":"https:\/\/prowebinhost.com\/anzu\/kenyan-royani-energy-limited-sues-uganda-national-oil-company-over-fuel-importation-deal\/","url_meta":{"origin":8162,"position":3},"title":"Kenyan Royani Energy Limited Sues Uganda National Oil Company Over Fuel Importation Deal","author":"UgandaUpdate","date":"December 5, 2023","format":false,"excerpt":"A Kenyan company ,Royani Energy Limited and concerned Kenyan citizens Charles Kombo and John Kinuthia have sued Uganda National Oil Company (UNOC) challenging the Oil importation Certificate to import petroleum products through Kenya. In their suit filed in a Kenyan Court, they insist that UNOC does not have Shs36bn turnover\u2026","rel":"","context":"In &quot;East Africa Regional News&quot;","block_context":{"text":"East Africa Regional News","link":"https:\/\/prowebinhost.com\/anzu\/category\/east-africa-regional-news\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/12\/R.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/12\/R.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/12\/R.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/12\/R.jpg 2x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/12\/R.jpg 3x"},"classes":[]},{"id":4607,"url":"https:\/\/prowebinhost.com\/anzu\/energy-ministry-calls-upon-investors-to-take-advantage-of-the-key-investment-opportunities-in-uganda-oil-and-gas-sector\/","url_meta":{"origin":8162,"position":4},"title":"Energy Ministry calls upon investors to take advantage of the key investment opportunities in Uganda\u2019 oil and gas sector","author":"UgandaUpdate","date":"November 20, 2021","format":false,"excerpt":"By Sierra Ruth Arinaitwe Uganda\u2019s Minister of Energy and Mineral Development Hon. Ruth Nankabirwa Ssentamu has called upon investors attending the Abu Dhabi International Petroleum exhibition and conference (Adipec) to partner with Uganda in developing the country\u2019s oil and gas resources. While giving her remarks during the conference held in\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/prowebinhost.com\/anzu\/category\/energy\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/11\/IMG-20211115-WA0140.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/11\/IMG-20211115-WA0140.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/11\/IMG-20211115-WA0140.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/11\/IMG-20211115-WA0140.jpg 2x"},"classes":[]},{"id":3837,"url":"https:\/\/prowebinhost.com\/anzu\/construction-of-oil-central-processing-facilities-in-buliisa-gets-underway-as-energy-minister-tour-the-albertine-graben\/","url_meta":{"origin":8162,"position":5},"title":"CONSTRUCTION OF OIL CENTRAL PROCESSING FACILITIES IN BULIISA GETS UNDERWAY AS  ENERGY MINISTERS TOUR THE ALBERTINE GRABEN","author":"UgandaUpdate","date":"August 13, 2021","format":false,"excerpt":"By Our Special Writer The earthmoving equipment is all busy moving from one side to another in a synchronized format. The site seems to stretch as far as the human naked eye could see. There are many people in helmets, reflector jackets, overall suits, and big boots. This massive construction\u2026","rel":"","context":"In &quot;National Development&quot;","block_context":{"text":"National Development","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-development\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/08\/IMG-20210813-WA0038.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/08\/IMG-20210813-WA0038.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/08\/IMG-20210813-WA0038.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/08\/IMG-20210813-WA0038.jpg 2x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/08\/IMG-20210813-WA0038.jpg 3x"},"classes":[]}],"jetpack_shortlink":"https:\/\/wp.me\/pc0aOV-27E","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/8162","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/comments?post=8162"}],"version-history":[{"count":1,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/8162\/revisions"}],"predecessor-version":[{"id":8166,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/8162\/revisions\/8166"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/media\/8163"}],"wp:attachment":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/media?parent=8162"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/categories?post=8162"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/tags?post=8162"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}