{"id":6684,"date":"2022-09-18T14:45:02","date_gmt":"2022-09-18T14:45:02","guid":{"rendered":"https:\/\/ugandaupdatenews.com\/?p=6684"},"modified":"2022-09-18T14:45:12","modified_gmt":"2022-09-18T14:45:12","slug":"oil-pipeline-project-will-go-ahead-dispite-eu-resolution-says-president-museveni","status":"publish","type":"post","link":"https:\/\/prowebinhost.com\/anzu\/oil-pipeline-project-will-go-ahead-dispite-eu-resolution-says-president-museveni\/","title":{"rendered":"OIL PIPELINE PROJECT WILL GO AHEAD DISPITE EU RESOLUTION SAYS PRESIDENT MUSEVENI"},"content":{"rendered":"\n<p>President Museveni  has assured Ugandans and the EAC region that  the East African Company Oil Pipeline (EACOP) project, will go ahead despite a resolution by European lawmakers calling for it to be delayed over &#8220;rights violations&#8221;.<\/p>\n\n\n\n<p>France&#8217;s TotalEnergies and the China National Offshore Oil Corporation (CNOOC) signed a $10-billion agreement earlier this year to develop Ugandan oilfields and ship the crude through a 1,445-kilometre (900-mile) pipeline to Tanzania&#8217;s Indian Ocean port of Tanga.<\/p>\n\n\n\n<p>\u201cI saw in the papers that the EU parliament passed a resolution directing TOTAL not to proceed with the East African Crude Oil Pipeline. Please, don\u2019t waste your time thinking about that. We have a contract with TOTAL written very well. The oil will come out in 2025, the first batch. The Oil project will go on and no one can stop it,\u201d President Museveni said during a meeting  at Kololo Independence grounds &#8216;<\/p>\n\n\n\n<p>Museveni later tweeted: \u201cTotal Energies convinced me about the Pipeline idea; if they choose to listen to the EU Parliament, we shall find someone else to work with\u2026Either way, we shall have our oil coming out by 2025 as planned. So, the people of Uganda should not worry.&#8221;<\/p>\n\n\n\n<p>President  Yoweri Museveni&#8217;s strong comments about this much desired project follow those of Deputy Speaker Thomas Tayebwa,  who stated thus ;&#8221;These are projects which were approved by the parliament of Uganda, the parliament of a sovereign country and anything to do with challenging their approval is an affront to the independence of this house and we cannot take it lightly,&#8221; he said.<\/p>\n\n\n\n<p>Tayebwa  lashed  out at the  \u00a0European Union Parliament \u00a0resolution calling the latest move by Europeans \u2013 \u201c economic racism\u201d and \u201cneo-colonialism.\u201d<\/p>\n\n\n\n<p>Presiding over parliament  Tayebwa \u00a0condemned the resolution saying the idea behind it is an act of neo-colonialism by the Europeans thinking that they can control the economic affairs of independent African countries.<\/p>\n\n\n\n<p>\u201cThe resolution is based on misinformation and deliberate misrepresentation of key facts on environment and human rights protection. It represents the highest level of neo-colonialism and imperialism against the sovereignty of Uganda and Tanzania\u201d Tayebwa charged.<\/p>\n\n\n\n<p>The production of Uganda\u2019s oil in 2025 remains on course as contractors \u2013 CNOOC and Total Energies have registered another milestone with the completion of their first oil drilling rigs for the Tilenga project after passing endurance tests at the Honghua Factory, Guanghan City in China.&nbsp;<\/p>\n\n\n\n<p>The huge -costly equipment which were shipped and have been on the high seas on the journey to Uganda is said to have arrived at the East African port of Mombasa according to a tweet from CNOOC Uganda Limited . The one of Total Energies is expected to arrive in Uganda in November ,2022.<\/p>\n\n\n\n<p>\u201d Steps to first oil.@ CNOOC Uganda Ltd Kingsfisher oilfield rig reaches Mombasa port and will soon be in Uganda and there\u2019s no turning back,\u201d CNOOC Uganda stated on their official Twitter handle.<\/p>\n\n\n\n<p>Once production commences -the oil will be transported to the sea port of Tanga in Tanzania through the East Africa Company Oil Pipeline ( EACOP) and will traverse the ten (10) districts of Hoima, Kikuube, Kakumiro, Kyankwanzi, Gomba, Mubende, Lwengo, Sembabule, Kyotera and Rakai in Uganda costing (approx. US$3.6bn).<\/p>\n\n\n\n<p>CNOOC is one of two licensed oil companies that will work on the EACOP project till 2025 when the first oil is expected to be produced in what will be historic milestone for Uganda and the East African region . The other company involved in EACOP project is Total Energies Co. ltd .<\/p>\n\n\n\n<p><br>Of the total 1,443km, Uganda will host 296 km of the pipeline. This is going to take up about 2,740 acres of land. A final Resettlement Action Plan report was submitted to the Ministry by the Pipeline Project Team (PPT) and the report was approved in 2021.<\/p>\n\n\n\n<p>Total Energies\u2019 Tier one contractor Zhongyuan Petroleum Exploration Bureau (ZPEB) received the oil rig code named \u2018ZPEB Rig 1501\u2019 at the official handover ceremony in China . ZPEB undertook to deliver the rigs after they \u2013 won the multi-million contract for the detailed designs and construction of oil drilling rigs for Uganda .<\/p>\n\n\n\n<p>Total Energies Uganda Consultant Mr Thierry Vinay was excited about this giant step forward and has stated thus;\u201d \u201cThis signifies progress towards the commencement of our drilling activities and subsequent delivery of first oil in Uganda. Thank you to all the teams that have worked tirelessly on building this rig and we look forward to receiving it in Uganda.\u201d<\/p>\n\n\n\n<p>The oil rig will be deployed to ensure the first oil production in 2025 at 400 oil wells -north of Lake Albert in Buliisa and Nyowa districts. \u00a0According to a statement from Total Energies \u2013 the \u2018ZPEB Rig 1501\u2019 is a highly innovative 1,500 Horsepower (HP) walking land rig with full integration, automation, low emission and is fully soundproofed.\u00a0The rig\u2019s 1,500 HP is equivalent to the horsepower of four heavy duty trucks.\u00a0<\/p>\n\n\n\n<p>CNOOC said their rig the first that will be deployed in East Africa region \u2013 has been customized for its Kingfisher wells . CNOOC says the rig is a fully automated silent industrial equipment that is outfitted with industry -leading technologies such as well -site de-noising control , a zero discharge system ,and a pipe column automation system.<\/p>\n\n\n\n<p>Total Energies will undertake drilling of more than 400 oil wells spread across 31 well pads in six fields (Jobi Rii, Ngiri, Gunya,Kigogole, Nsoga, Kasemene and Wahrindi) in Nwoya and Buliisa districts.&nbsp;<\/p>\n\n\n\n<p>The company is undertaking major infrastructural developments to allow timely drilling operations that will include the construction of the Tangi Operation Support Base camp. Some 600 oil workers for the exploitation of oil resources within Murchison Falls Park will be housed here .<\/p>\n\n\n\n<p>The company is also undertaking civil works of the industrial area in Buliisa District. This covers 300 hectares and it will host the Central Processing Facility (CPF) operating for 24 hours with camping facilities for 4,000 people, an operations support base, drilling base, wastewater treatment plant, and a lake water abstraction system.<\/p>\n\n\n\n<p>The CPF will process 190,000 barrels of oil per day with a supply of crude oil through 160 kilometers of flow-lines from the oil wells.&nbsp; Another 95 kilometre-24 inch feeder pipeline will transport the processed crude oil from the central processing facility in Buliisa to the export hub and refinery in Kabaale in Hoima.<\/p>\n\n\n\n<p><strong>Minister Hon. Dr. Nankabirwa busy clearing all the hurdles to ensure smooth implementation<\/strong><\/p>\n\n\n\n<p>Energy Minister Hon. Ruth Nankabirwa and the ministry\u2019s technical team led by Eng. Irene Batebe has been working around the clock to clear all obstacles that could undermine the fast and smooth implemnattion of the strategic national development project . The Ministry of Energy has since speared headed the passing of the East African Crude Oil Pipeline (EACOP) (Special Provisions) law \u2013 which is an important \u201clegislation of our time\u201d- because it will facilitate the first crude oil pipeline development in Uganda and the East African Region.<\/p>\n\n\n\n<p>Nankabirwa has said that the law will facilitate the Implementation of &nbsp;two important agreements \u2013 the&nbsp;<a>Intergovernmental Agreement (IGA)<\/a>&nbsp;between the Republic of Uganda and the United Republic of Tanzania which was signed &nbsp;on May 26 2017&nbsp; and the &nbsp;Host Government Agreement (HGA) -which&nbsp; was entered between the Republic of Uganda and the EACOP Company.<\/p>\n\n\n\n<p><strong>Moses Paul Sserwanga Esq.<\/strong><\/p>\n\n\n\n<p><strong>Media and Communications Consultant \/Advocate of the High Court<\/strong><\/p>\n\n\n\n<p><strong>msserwanga<\/strong>@gmail.com<\/p>\n\n\n\n<p>C\/O Prime Time Communications Ltd<\/p>\n","protected":false},"excerpt":{"rendered":"<p>President Museveni has assured Ugandans and the EAC region that the East African Company Oil Pipeline (EACOP) project, will go<\/p>\n","protected":false},"author":1,"featured_media":6685,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[168,214],"tags":[],"class_list":["post-6684","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-national-development","category-oil-production"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/latest02pix-data.jpg","jetpack-related-posts":[{"id":6670,"url":"https:\/\/prowebinhost.com\/anzu\/oil-production-uganda-s-parliament-deputy-speaker-tayebwa-hits-back-at-eu-parliament-resolution-calls-it-economic-racism-and-neo-colonialism\/","url_meta":{"origin":6684,"position":0},"title":"OIL PRODUCTION : UGANDA \u2018S PARLIAMENT DEPUTY SPEAKER TAYEBWA HITS BACK AT EU PARLIAMENT RESOLUTION CALLS IT ECONOMIC RACISM AND NEO COLONIALISM","author":"UgandaUpdate","date":"September 15, 2022","format":false,"excerpt":"Uganda \u2018s Parliament -Deputy Speaker \u00a0Thomas Tayebwa has lashed at this week\u2019s \u00a0European Union Parliament \u00a0resolution that seeks to block the construction of the East African Crude Oil Pipeline (EACOP) calling the latest move by Europeans \u2013 \u201c economic racism\" and \"neo-colonialism.\u201d Presiding over parliament on Thursday afternoon Tayebwa \u00a0condemned\u2026","rel":"","context":"In &quot;Oil Production&quot;","block_context":{"text":"Oil Production","link":"https:\/\/prowebinhost.com\/anzu\/category\/oil-production\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/IMG-20220915-WA0264.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/IMG-20220915-WA0264.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/IMG-20220915-WA0264.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/IMG-20220915-WA0264.jpg 2x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/IMG-20220915-WA0264.jpg 3x"},"classes":[]},{"id":2987,"url":"https:\/\/prowebinhost.com\/anzu\/museveni-suluhu-sign-east-african-crude-pol-pipeline-oil-companies-say-oil-will-start-flowing-in-2025\/","url_meta":{"origin":6684,"position":1},"title":"MUSEVENI , SULUHU SIGN EAST AFRICAN CRUDE OIL PIPELINE; OIL COMPANIES SAY OIL WILL START FLOWING IN 2025","author":"MOSES SSERWANGA","date":"April 12, 2021","format":false,"excerpt":"President Yoweri Museveni\u00a0 of Uganda and his counterpart President Samia Suhulu Hassan of \u00a0Tanzania were joined by the two oil companies of Total E&P, and China\u2019s CNOOC to finally \u00a0sign the East African Crude Oil Pipeline in the Capital Kampala . The \u00a0deal will \u00a0ensure oil production begins and is\u2026","rel":"","context":"In &quot;National Development&quot;","block_context":{"text":"National Development","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-development\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/04\/m7-suhulu.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/04\/m7-suhulu.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/04\/m7-suhulu.jpg 1.5x"},"classes":[]},{"id":2981,"url":"https:\/\/prowebinhost.com\/anzu\/uganda-s-president-museveni-and-tanzanias-samia-suluhu-hassan-set-to-sign-landmark-oil-pipeline-deal-as-vehicle-production-companies-prepare-to-benefit\/","url_meta":{"origin":6684,"position":2},"title":"UGANDA \u2018S PRESIDENT  MUSEVENI AND TANZANIA\u2019S SAMIA SULUHU HASSAN SET TO SIGN LANDMARK OIL PIPELINE DEAL AS VEHICLE PRODUCTION COMPANIES PREPARE TO BENEFIT","author":"MOSES SSERWANGA","date":"April 11, 2021","format":false,"excerpt":"Uganda\u2019s President Yoweri Museveni will this morning\u00a0 host his \u00a0Tanzanian counterpart President, Samia Suluhu Hassan to among others ,sign the long awaited \u00a0oil pipeline deal which her predecessor the late John Pombe Magufuli worked so hard to realise . The two heads\u2019 of state meeting at\u00a0 State House Entebbe- \u00a0will\u2026","rel":"","context":"In &quot;Development&quot;","block_context":{"text":"Development","link":"https:\/\/prowebinhost.com\/anzu\/category\/development\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/04\/56927314_401.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/04\/56927314_401.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/04\/56927314_401.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/04\/56927314_401.jpg 2x"},"classes":[]},{"id":1877,"url":"https:\/\/prowebinhost.com\/anzu\/museveni-flies-to-tanzania-to-sign-implementation-agreement-for-ugandas-oil-pipeline\/","url_meta":{"origin":6684,"position":3},"title":"MUSEVENI FLIES TO TANZANIA  TO SIGN IMPLEMENTATION AGREEMENT FOR  UGANDA\u2019S OIL PIPELINE","author":"UgandaUpdate","date":"September 13, 2020","format":false,"excerpt":"President Yoweri Museveni \u00a0flew out of the country for the first time since the outbreak of the global-novel-Covid-19 pandemic to meet his Tanzanian counterpart John Pombe Magufuli and \u00a0sign an implementation agreement for the East African Crude Oil Pipeline. Museveni is visit in Tanzania follows \u00a0the signing of the Host\u2026","rel":"","context":"In &quot;Economy&quot;","block_context":{"text":"Economy","link":"https:\/\/prowebinhost.com\/anzu\/category\/economy\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2020\/09\/Magufui-and-kaguta-1.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2020\/09\/Magufui-and-kaguta-1.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2020\/09\/Magufui-and-kaguta-1.jpg 1.5x"},"classes":[]},{"id":16438,"url":"https:\/\/prowebinhost.com\/anzu\/tanzania-leader-gives-timeline-on-regional-oil-pipeline-project\/","url_meta":{"origin":6684,"position":4},"title":"Tanzania leader gives timeline on regional oil pipeline project","author":"UgandaUpdate","date":"February 9, 2026","format":false,"excerpt":"Tanzanian President Samia Suluhu Hassan has told her Ugandan counterpart Yoweri Museveni that works for an East African Crude Oil Pipeline Project were on track to finish in five months. President Museveni is on an official working visit on\u00a0 the invitation of Tanzania\u2019s first female leader. In a meeting between\u2026","rel":"","context":"In &quot;National News&quot;","block_context":{"text":"National News","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-news\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":6744,"url":"https:\/\/prowebinhost.com\/anzu\/eacop-project-will-spur-socio-economic-growth-end-energy-challenges-amb-amoru\/","url_meta":{"origin":6684,"position":5},"title":"EACOP project will spur socio-economic growth, end energy challenges- Amb Amoru","author":"UgandaUpdate","date":"September 26, 2022","format":false,"excerpt":"Johannesburg\u00a0\u2013 Uganda\u2019s High Commissioner to South Africa Paul Amoru has said the East African Crude Oil Pipeline (EACOP) Project will provide a solution to the energy poverty while driving socioeconomic growth through the empowerment of local communities. He was making a presentation at the \u201cConnecting Africa\u201d summit held in Johannesburg\u2026","rel":"","context":"In &quot;Africa Continental News&quot;","block_context":{"text":"Africa Continental News","link":"https:\/\/prowebinhost.com\/anzu\/category\/africa-continental-news\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/pau.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/pau.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/pau.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/pau.jpg 2x"},"classes":[]}],"jetpack_shortlink":"https:\/\/wp.me\/pc0aOV-1JO","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/6684","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/comments?post=6684"}],"version-history":[{"count":1,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/6684\/revisions"}],"predecessor-version":[{"id":6686,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/6684\/revisions\/6686"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/media\/6685"}],"wp:attachment":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/media?parent=6684"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/categories?post=6684"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/tags?post=6684"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}