{"id":6644,"date":"2022-09-15T07:26:01","date_gmt":"2022-09-15T07:26:01","guid":{"rendered":"https:\/\/ugandaupdatenews.com\/?p=6644"},"modified":"2022-09-15T16:03:31","modified_gmt":"2022-09-15T16:03:31","slug":"uganda-s-oil-production-on-course-as-total-energies-ships-first-oil-drilling-rig","status":"publish","type":"post","link":"https:\/\/prowebinhost.com\/anzu\/uganda-s-oil-production-on-course-as-total-energies-ships-first-oil-drilling-rig\/","title":{"rendered":"UGANDA &#8216;S OIL PRODUCTION ON COURSE AS TOTAL ENERGIES SHIPS FIRST OIL DRILLING RIG"},"content":{"rendered":"\n<p><strong>The heavy duty equipment expected in Uganda in November 2022<\/strong><\/p>\n\n\n\n<p>The production of Uganda&#8217;s oil in 2025 remains on course as the contractor -Total Energies has registered another milestone with the  completion  of its first oil drilling rig for the Tilenga project after passing endurance tests at the Honghua Factory, Guanghan City in China.\u00a0 <\/p>\n\n\n\n<p>The huge -costly equipment  which was  shipped last month  and  been  on the high seas on its journey to  Uganda is said to have arrived at the East African port of Mombasa according to a  tweet from  CNOOC Uganda Limited .<\/p>\n\n\n\n<p>&#8221; Steps to first oil.@ CNOOC Uganda Ltd Kingsfisher oilfield rig reaches Mombasa port  and will soon be  in Uganda and there&#8217;s no turning back,&#8221; CNOOC Uganda stated on their official Twitter handle.<\/p>\n\n\n\n<p>Once production commences -the oil will be transported to the sea port of Tanga in Tanzania through the  East Africa Company Oil Pipeline ( EACOP)  and will traverse the ten (10) districts of Hoima, Kikuube, Kakumiro, Kyankwanzi, Gomba, Mubende, Lwengo, Sembabule, Kyotera and Rakai in Uganda costing (approx. US$3.6bn). CNOOC is one of two licensed oil companies that will work on  the EACOP project till 2025 when the  first oil is expected to be produced in what will be historic milestone for Uganda and the East African region .<\/p>\n\n\n\n<p><br>Of the total 1,443km, Uganda will host 296 km of the pipeline. This is going to take up about 2,740 acres of land. A final Resettlement Action Plan report was submitted to the Ministry by the Pipeline Project Team (PPT) and the report was approved in 2021.<\/p>\n\n\n\n<p>Total Energies\u2019 Tier one contractor Zhongyuan Petroleum Exploration Bureau (ZPEB) received the oil rig code named \u2018ZPEB Rig 1501\u2019 at the official handover ceremony in China . ZPEB undertook to deliver the rigs after they &#8211;  won the multi-million  contract for the detailed designs and construction of oil drilling rigs for Uganda .<\/p>\n\n\n\n<p>Total Energies Uganda Consultant  Mr Thierry Vinay  was excited about this giant step forward and has stated thus;&#8221; \u201cThis signifies progress towards the commencement of our drilling activities and subsequent delivery of first oil in Uganda. Thank you to all the teams that have worked tirelessly on building this rig and we look forward to receiving it in Uganda.\u201d<\/p>\n\n\n\n<p>The oil rig will be deployed to ensure the first oil production in 2025 at  400 oil wells -north of Lake Albert in Buliisa and Nyowa districts. &nbsp;According to a statement from Total Energies &#8211; the \u2018ZPEB Rig 1501\u2019 is a highly innovative 1,500 Horsepower (HP) walking land rig with full integration, automation, low emission and is fully soundproofed.&nbsp;The rig\u2019s 1,500 HP is equivalent to the horsepower of four heavy duty trucks.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"640\" height=\"406\" data-attachment-id=\"6646\" data-permalink=\"https:\/\/prowebinhost.com\/anzu\/uganda-s-oil-production-on-course-as-total-energies-ships-first-oil-drilling-rig\/cover_oil\/\" data-orig-file=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/cover_oil.jpg\" data-orig-size=\"640,406\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"cover_oil\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/cover_oil.jpg\" data-large-file=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/cover_oil.jpg\" src=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/cover_oil.jpg\" alt=\"\" class=\"wp-image-6646\" srcset=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/cover_oil.jpg 640w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/cover_oil.jpg 300w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/figure>\n\n\n\n<p>The substructure and rig floor integrates all the necessary equipment to allow its movement from one oil well to another well during drilling operations without equipment disconnection.&nbsp;<\/p>\n\n\n\n<p>The testing of the rig involved 100 percent of the rig equipment being installed and run simultaneously and continuously for 24 hours up to maximum working pressure (90 percent) of the system.&nbsp;<\/p>\n\n\n\n<p>Total Energies says that -a 24-hour endurance test is so stringent, that if a problem is identified requiring stoppage for more than 30 minutes, then a 24-hour count must be restarted to ensure that the problem is resolved.\u00a0 \u00a0 While providing more information about this important development , CNOOC  said the rig the first that will be deployed in East Africa region &#8211; has been customised for its Kingfisher wells . CNOOC says the rig is a fully automated silent industrial equipment that is outfitted with industry -leading technologies such as well -site de-noising control , a zero discharge system ,and a pipe column automation system. <\/p>\n\n\n\n<p>Total Energies will undertake drilling of more than 400 oil wells spread across 31 well pads in six fields (Jobi Rii, Ngiri, Gunya,Kigogole, Nsoga, Kasemene and Wahrindi) in Nwoya and Buliisa districts.&nbsp;<\/p>\n\n\n\n<p>The company is undertaking major infrastructural developments to allow timely drilling operations that will include  the construction of the Tangi Operation Support Base camp. Some  600 oil workers for the exploitation of oil resources within Murchison Falls Park  will be housed here .<\/p>\n\n\n\n<p>The company is also undertaking civil works of the industrial area in Buliisa District. This  covers 300 hectares and it will host the Central Processing Facility (CPF) operating for 24 hours with camping facilities for 4,000 people, an operations support base, drilling base, wastewater treatment plant, and a lake water abstraction system.<\/p>\n\n\n\n<p>The CPF will process 190,000 barrels of oil per day with a supply of crude oil through 160 kilometers of flow-lines from the oil wells.&nbsp; Another 95 kilometre-24 inch feeder pipeline will transport the processed crude oil from the central processing facility in Buliisa to the export hub and refinery in Kabaale in Hoima.<\/p>\n\n\n\n<p><strong>Minister Hon. Dr. Nankabirwa busy clearing all the hurdles to ensure smooth implementation<\/strong> <\/p>\n\n\n\n<p>Energy Minister Hon. Ruth Nankabirwa and the ministry&#8217;s technical team led by Eng. Irene Batebe  has been working around the clock to clear all obstacles that could undermine the fast and smooth implemnattion of the strategic national development project . The Ministry of Energy has since speared headed the passing of the East African Crude Oil Pipeline (EACOP) (Special Provisions) law &#8211; which is an important \u201clegislation of our time\u201d- because it will facilitate the first crude oil pipeline development in Uganda and the East African Region.<\/p>\n\n\n\n<p>Nankabirwa has said that the law will facilitate the Implementation of &nbsp;two important agreements \u2013 the <a>Intergovernmental Agreement (IGA)<\/a>&nbsp;between the Republic of Uganda and the United Republic of Tanzania which was signed &nbsp;on May 26 2017&nbsp; and the &nbsp;Host Government Agreement (HGA) -which&nbsp; was entered between the Republic of Uganda and the EACOP Company.<\/p>\n\n\n\n<p><strong>Moses Paul Sserwanga Esq.<\/strong><\/p>\n\n\n\n<p><strong>Media and Communications Consultant \/Advocate of the High Court <\/strong><\/p>\n\n\n\n<p><strong>msserwanga<\/strong>@gmail.com  <\/p>\n\n\n\n<p>C\/O Prime Time Communications Ltd<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The heavy duty equipment expected in Uganda in November 2022 The production of Uganda&#8217;s oil in 2025 remains on course<\/p>\n","protected":false},"author":1,"featured_media":6645,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[214],"tags":[],"class_list":["post-6644","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-oil-production"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/home13pix.jpg","jetpack-related-posts":[{"id":6666,"url":"https:\/\/prowebinhost.com\/anzu\/uganda-s-oil-production-on-course-as-cnoocs-oil-drilling-rig-arrives-at-mombasa-and-the-one-of-total-energies-is-expected-in-november\/","url_meta":{"origin":6644,"position":0},"title":"UGANDA \u2018S OIL PRODUCTION ON COURSE AS CNOOC&#8217;S OIL DRILLING  RIG ARRIVES AT MOMBASA AND THE ONE OF TOTAL ENERGIES IS EXPECTED IN NOVEMBER","author":"UgandaUpdate","date":"September 15, 2022","format":false,"excerpt":"By Our Special Correspondent The heavy duty equipment expected in Uganda in November 2022 The production of Uganda's oil in 2025 remains on course as contractors - CNOOC and Total Energies have registered another milestone with the completion of their first oil drilling rigs for the Tilenga project after passing\u2026","rel":"","context":"In &quot;National News&quot;","block_context":{"text":"National News","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-news\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/home13pix.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/home13pix.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/home13pix.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/home13pix.jpg 2x"},"classes":[]},{"id":6684,"url":"https:\/\/prowebinhost.com\/anzu\/oil-pipeline-project-will-go-ahead-dispite-eu-resolution-says-president-museveni\/","url_meta":{"origin":6644,"position":1},"title":"OIL PIPELINE PROJECT WILL GO AHEAD DISPITE EU RESOLUTION SAYS PRESIDENT MUSEVENI","author":"UgandaUpdate","date":"September 18, 2022","format":false,"excerpt":"President Museveni has assured Ugandans and the EAC region that the East African Company Oil Pipeline (EACOP) project, will go ahead despite a resolution by European lawmakers calling for it to be delayed over \"rights violations\". France's TotalEnergies and the China National Offshore Oil Corporation (CNOOC) signed a $10-billion agreement\u2026","rel":"","context":"In &quot;National Development&quot;","block_context":{"text":"National Development","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-development\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/latest02pix-data.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/latest02pix-data.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/09\/latest02pix-data.jpg 1.5x"},"classes":[]},{"id":8037,"url":"https:\/\/prowebinhost.com\/anzu\/uganda-approves-construction-licence-for-usd-3-5bn-crude-pipeline\/","url_meta":{"origin":6644,"position":2},"title":"Uganda approves construction licence for USD.3.5Bn crude pipeline","author":"UgandaUpdate","date":"January 20, 2023","format":false,"excerpt":"By Our Reporter in Kampala The development of Uganda's nascent oil and gas sector registered yet another major milestone when Uganda has approved an application by a company controlled by France's TotalEnergies\u00a0\u00a0to construct a $3.5 billion oil pipeline that will transport the country's crude to international markets. The approval is\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/prowebinhost.com\/anzu\/category\/energy\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/01\/cover_oil.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/01\/cover_oil.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/01\/cover_oil.jpg 1.5x"},"classes":[]},{"id":8086,"url":"https:\/\/prowebinhost.com\/anzu\/president-museveni-commissions-drilling-of-kingfisher-oil-fields-in-kikuube-asks-locals-to-cash-in-by-producing-food\/","url_meta":{"origin":6644,"position":3},"title":"President Museveni commissions \u00a0drilling of kingfisher oil fields in KiKuube, asks locals to cash in by producing food","author":"UgandaUpdate","date":"January 25, 2023","format":false,"excerpt":"BY OUR REPORTERS in Kikuube President Museveni has \u00a0commissioned the drilling of oil and development of production wells for the Kingfisher oil fields in Kikuube district, operated by CNOOC Uganda and joint venture partners UNOC and Total E&P.-paving way for commercial production of oil in Uganda for the first time\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/prowebinhost.com\/anzu\/category\/energy\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/01\/Museveni-commission-Cnooc-oil-rig.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/01\/Museveni-commission-Cnooc-oil-rig.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/01\/Museveni-commission-Cnooc-oil-rig.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/01\/Museveni-commission-Cnooc-oil-rig.jpg 2x"},"classes":[]},{"id":10171,"url":"https:\/\/prowebinhost.com\/anzu\/after-fatal-accident-kingfishers-institutes-additional-safety-measures-as-project-works-resume\/","url_meta":{"origin":6644,"position":4},"title":"After fatal accident ,Kingfisher institutes additional  safety measures as project works resume","author":"UgandaUpdate","date":"October 16, 2023","format":false,"excerpt":"After a fatal accident was registered at Uganda's oil grilling Kingfisher Development Area in Kikuube district, the Petroleum Authority of Uganda (PAU) has lifted the suspension to allow for resumption of operations with additional safety measures put in place. The PAU ED, Mr. Ernest Rubondo, said in a statement thus\u2026","rel":"","context":"In &quot;Oil Production&quot;","block_context":{"text":"Oil Production","link":"https:\/\/prowebinhost.com\/anzu\/category\/oil-production\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/10\/kingfisher.jpg","width":350,"height":200},"classes":[]},{"id":3073,"url":"https:\/\/prowebinhost.com\/anzu\/ugandans-should-prepare-and-be-ready-for-160000-jobs-in-the-oil-and-gas-sector-minister-nabakooba\/","url_meta":{"origin":6644,"position":5},"title":"UGANDANS SHOULD PREPARE AND BE READY FOR 160,000 JOBS IN THE OIL AND GAS SECTOR -MINISTER NABAKOOBA","author":"UgandaUpdate","date":"April 25, 2021","format":false,"excerpt":"Ugandans should prepare and be ready to grab an estimated 160,000 jobs that will be available in the oil and gas sector from June this year , \u00a0Minister of Information ,Ms. Judith Nabakooba ,has said. Nbakooba in her weekly media briefing said that President Museveni\u00a0 agreed to sing the oil\u2026","rel":"","context":"In &quot;Business&quot;","block_context":{"text":"Business","link":"https:\/\/prowebinhost.com\/anzu\/category\/business\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/04\/naa.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/04\/naa.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/04\/naa.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/04\/naa.jpg 2x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/04\/naa.jpg 3x"},"classes":[]}],"jetpack_shortlink":"https:\/\/wp.me\/pc0aOV-1Ja","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/6644","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/comments?post=6644"}],"version-history":[{"count":2,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/6644\/revisions"}],"predecessor-version":[{"id":6665,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/6644\/revisions\/6665"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/media\/6645"}],"wp:attachment":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/media?parent=6644"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/categories?post=6644"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/tags?post=6644"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}