{"id":5885,"date":"2022-06-11T15:58:12","date_gmt":"2022-06-11T15:58:12","guid":{"rendered":"https:\/\/ugandaupdatenews.com\/?p=5885"},"modified":"2022-06-11T15:58:28","modified_gmt":"2022-06-11T15:58:28","slug":"umeme-failing-chinese-investors-in-wakiso-they-petition-prime-minister-over-unstable-electricity","status":"publish","type":"post","link":"https:\/\/prowebinhost.com\/anzu\/umeme-failing-chinese-investors-in-wakiso-they-petition-prime-minister-over-unstable-electricity\/","title":{"rendered":"Umeme failing Chinese Investors in Wakiso, they  Petition Prime Minister Over Unstable Electricity"},"content":{"rendered":"\n<figure class=\"wp-block-table\"><table><tbody><tr><td><\/td><td><strong>Minister Nankabirwa intervenes following Prime Minister&#8217;s directive <\/strong><br><br>The Minister of  Energy Dr. Ruth Nankabirwa has carried out an on the spot inspection of factories in Wakiso district to establish why there is poor  electricity supply in the  area . She has also directed her technical team at the ministry to investigate the matter and find a lasting solution within seven days .<br><br>This is after the Chinese investors operating different factories in Kakiri Town, Wakiso District petitioned the Prime Minister Robinah Nabbanja to express their frustration with the erratic electricity supply in the area.<br><br>Represented by Cai Jiashun, Zong Bo and Lin Yangbin, the investors early this week petitioned Nabbanja explaining that irregular power supply in the area has slowed down production at their factories while several machines have been rendered faulty due to erratic power supply.<br><br>They operate such companies as Sky Pipes Company Limited that specializes in manufacturing of integrated plastic pipes and Zhong Kai Electronics Limited, a manufacturing plant for house ceilings which they sell locally and export bulk of the products within Africa. They occupy 35 acres of land in Nakyerongoosa village, along Kampala \u2013 Hoima highway.<br><br>In their petition, the investors also indicated that for the unreliable power, the electricity tariff levies on their factories are extremely exorbitant forcing them to resort to standby generators in the wake soaring fuel prices. Ricky Tumwesiga, an Administrator at Sky Pipes and Zhong Kai Electronics, and a language translator for the investors revealed that they spend over 100 million Shillings in purchasing diesel fuel every month to run the generators due to rampant outage or dim power.<br><br>They said that they  spend at least 400 million Shillings on electricity bills every month, describing it as an expensive venture on their investment. They also reportedly employ over 800 Ugandans. <br><br>In her response, the Prime Minister directed Ruth Nankabirwa, the Minister of Energy and Mineral Development to undertake a fact-finding visit to factory sites and expeditiously fix the problem in order to protect the investors.<br><br>During her spot field visit, Nankabirwa could not establish the reasons for power unreliability, as no technical persons from Umeme Ltd, the largest energy distributor in Uganda that oversees the transmission line in the area was present. She directed the technical department of her Ministry to investigate the matter within seven days.  The area Umeme manager directed to fix the problem within  one week.<br><br>Dr Patricia Kevin Litho, the Principle Communications Officer at the Ministry of Energy says that a technical team in the Ministry is already on the ground to investigate the matter in order to come up with appropriate interventions. Kakiri is a fast growing area that is also home to many of Kampala City\u2019s workers, factories and military installations. It currently relies on the Kawanda and Busunju feeder  power lines.<br><br>In April 2020, the power distributor Umeme announced that it would establish a 4.9 billion shilling sub-station in the area to improve electricity reliability.<a href=\"https:\/\/www.google.com\/gmail\/about\/policy\/\" target=\"_blank\" rel=\"noreferrer noopener\"><\/a><\/td><td><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"911\" height=\"460\" data-attachment-id=\"5888\" data-permalink=\"https:\/\/prowebinhost.com\/anzu\/umeme-failing-chinese-investors-in-wakiso-they-petition-prime-minister-over-unstable-electricity\/nak2\/\" data-orig-file=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/06\/nak2.jpg\" data-orig-size=\"911,460\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"nak2\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/06\/nak2.jpg\" data-large-file=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/06\/nak2.jpg\" src=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/06\/nak2.jpg\" alt=\"\" class=\"wp-image-5888\" srcset=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/06\/nak2.jpg 911w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/06\/nak2.jpg 300w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/06\/nak2.jpg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption>Dr . Ruth Nankabirwa meeting Chinese over Umeme issues in Wakiso district <\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Minister Nankabirwa intervenes following Prime Minister&#8217;s directive The Minister of Energy Dr. Ruth Nankabirwa has carried out an on the<\/p>\n","protected":false},"author":1,"featured_media":5887,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[65,87],"tags":[],"class_list":["post-5885","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-national-news","category-energy"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/06\/nak.jpg","jetpack-related-posts":[{"id":3795,"url":"https:\/\/prowebinhost.com\/anzu\/energy-ministry-amends-law-to-allow-direct-purchase-of-electricity-by-industrialists\/","url_meta":{"origin":5885,"position":0},"title":"Energy Ministry amends law to allow direct purchase of electricity by Industrialists","author":"UgandaUpdate","date":"August 6, 2021","format":false,"excerpt":"Energy and Mineral Development (MEMD), Minister Hon. Ruth Nankabirwa has revealed that government has gone ahead with its promise and \u00a0successfully amended the Electricity Act 1999 to allow direct purchase of electricity from transmission companies \u00a0by large industrial customers in a concerted effort to reduce tariffs for manufacturers. Hon. Nankabirwa\u2026","rel":"","context":"In &quot;Economy&quot;","block_context":{"text":"Economy","link":"https:\/\/prowebinhost.com\/anzu\/category\/economy\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":9481,"url":"https:\/\/prowebinhost.com\/anzu\/karuma-hydro-power-project-to-be-commissioned-by-president-museveni-says-pm-nabbanja\/","url_meta":{"origin":5885,"position":1},"title":"Karuma Hydro Power Project to be commissioned by President Museveni says PM Nabbanja","author":"UgandaUpdate","date":"July 17, 2023","format":false,"excerpt":"One of Uganda's leading mega development project which is expected to increased national economic growth and development , the Karuma Hydro Power Project in Kiryandongo District, is ready and will be launched by President Yoweri Museveni later this year ,Prime Minister, Robinah Nabbanja has announced. Nabbanja who was on a\u2026","rel":"","context":"In &quot;National News&quot;","block_context":{"text":"National News","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-news\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/07\/PM-Nabbanja-and-visiting-team-being-briefed-outside-the-control-room.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/07\/PM-Nabbanja-and-visiting-team-being-briefed-outside-the-control-room.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/07\/PM-Nabbanja-and-visiting-team-being-briefed-outside-the-control-room.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/07\/PM-Nabbanja-and-visiting-team-being-briefed-outside-the-control-room.jpg 2x"},"classes":[]},{"id":9367,"url":"https:\/\/prowebinhost.com\/anzu\/energy-minister-nankabirwa-inspects-progress-of-works-at-nyagak-iii-hydro-power-plant-pledges-increase-of-electricity-supply-to-west-nile\/","url_meta":{"origin":5885,"position":2},"title":"Energy Minister Nankabirwa Inspects Progress Of Works At Nyagak III Hydro Power Plant, Pledges Increase of Electricity Supply to West Nile","author":"UgandaUpdate","date":"July 2, 2023","format":false,"excerpt":"Energy Minister Dr Ruth Nankabirwa has toured the Nyagak III hydro power plant in Zombo district. During the inspection of the project, Nankabirwa expressed happiness with the progress of work undertaken so far and pledged to convince the ministry of finance to release the 28bshs to finalize the project. The\u2026","rel":"","context":"In &quot;National News&quot;","block_context":{"text":"National News","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-news\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/07\/nank.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/07\/nank.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/07\/nank.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/07\/nank.jpg 2x"},"classes":[]},{"id":4085,"url":"https:\/\/prowebinhost.com\/anzu\/energy-minister-nankabirwa-assures-ugandans-that-karuma-hydro-power-plant-will-be-commisioned-next-year-and-power-evacuated-to-west-nile-and-other-needy-regions\/","url_meta":{"origin":5885,"position":3},"title":"ENERGY MINISTER NANKABIRWA ASSURES UGANDANS THAT KARUMA HYDRO POWER PLANT WILL BE COMMISIONED NEXT YEAR AND POWER EVACUATED TO WEST NILE AND OTHER NEEDY REGIONS","author":"MOSES SSERWANGA","date":"September 24, 2021","format":false,"excerpt":"BY MOSES SSERWANGA In West Nile The Minister of Energy and Mineral Developments, Hon. Ruth Nankabirwa has assured \u00a0the country that the construction of the 600MW Karuma Hydro Power Plant \u00a0will completed and ready for \u00a0commissioning mid next year . Hon. Nankabirwa was also happy to note that the contractor\u2026","rel":"","context":"In &quot;National News&quot;","block_context":{"text":"National News","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-news\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":6494,"url":"https:\/\/prowebinhost.com\/anzu\/prime-minister-nabbanja-launches-energy-program-for-refugees-in-uganda\/","url_meta":{"origin":5885,"position":4},"title":"PRIME MINISTER NABBANJA LAUNCHES ENERGY PROGRAM FOR REFUGEES IN UGANDA","author":"UgandaUpdate","date":"August 25, 2022","format":false,"excerpt":"Uganda is the first country in the world to develop a Comprehensive Refugee Response Framework (CRRF) By Our Reporter KAMPALA \u2013 The Prime Minister, Robinah Nabbanja, has launched a four-year (2022-2025) Sustainable Energy Response Plan (SERP) for refugees and their host communities. Through the programme, the government targets to support\u2026","rel":"","context":"In &quot;National News&quot;","block_context":{"text":"National News","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-news\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/08\/dr-r.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/08\/dr-r.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/08\/dr-r.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/08\/dr-r.jpg 2x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/08\/dr-r.jpg 3x"},"classes":[]},{"id":6413,"url":"https:\/\/prowebinhost.com\/anzu\/isimba-hydropower-plant-to-resume-generation-of-electricity-in-three-weeks-says-minister-nankabirwa\/","url_meta":{"origin":5885,"position":5},"title":"ISIMBA HYDROPOWER PLANT TO RESUME GENERATION OF ELECTRICITY IN THREE WEEKS SAYS MINISTER NANKABIRWA","author":"UgandaUpdate","date":"August 16, 2022","format":false,"excerpt":"BY OUR REPORTER The Minister of Energy and Mineral Development (MEMD) Hon.Ruth Nankabirwa has \u00a0said that following the emergency shutdown of the 183 MW Isimba hydropower plant in Kayunga district the operator -Uganda Electricity Generation Company Limited (UEGCL) is working \u00a0to restore power production at hydropower plant and resume generation\u2026","rel":"","context":"In &quot;National News&quot;","block_context":{"text":"National News","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-news\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/08\/Nankabirwa.webp","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/08\/Nankabirwa.webp 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/08\/Nankabirwa.webp 1.5x"},"classes":[]}],"jetpack_shortlink":"https:\/\/wp.me\/pc0aOV-1wV","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/5885","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/comments?post=5885"}],"version-history":[{"count":2,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/5885\/revisions"}],"predecessor-version":[{"id":5889,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/5885\/revisions\/5889"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/media\/5887"}],"wp:attachment":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/media?parent=5885"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/categories?post=5885"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/tags?post=5885"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}