{"id":2253,"date":"2020-11-16T08:49:01","date_gmt":"2020-11-16T08:49:01","guid":{"rendered":"https:\/\/ugandaupdatenews.com\/?p=2253"},"modified":"2020-11-16T08:49:09","modified_gmt":"2020-11-16T08:49:09","slug":"weighbridges-prolonging-road-lifespan","status":"publish","type":"post","link":"https:\/\/prowebinhost.com\/anzu\/weighbridges-prolonging-road-lifespan\/","title":{"rendered":"Weighbridges prolonging road lifespan"},"content":{"rendered":"\n<p>One of the challenges of maintaining gravel roads in Mukono District is lack of axle-control yet the district given its terrain is one of the major sources of sand and other building materials for Kampala, a city that is expanding at a very high speed.&nbsp;<\/p>\n\n\n\n<p>If heavy trucks are a nightmare for gravel and graded roads, which are easier to maintain, imagine the damage they can cause to paved roads that are far more expensive to look after.&nbsp;<\/p>\n\n\n\n<p>With financing from the Uganda Road Fund (URF), the Uganda National Road Authority (UNRA) has been able to prolong the life of its roads across the country through enforcement of axle load control.&nbsp;<\/p>\n\n\n\n<p>Any vehicle that carries 18 tons and above is required to go through a weighbridge to determine its weight and if it is found to be beyond its load limit, a fine is levied and ordered to carry only what is legally acceptable.&nbsp;<\/p>\n\n\n\n<p>The Kampala-Malaba\/Busia highway is Uganda\u2019s major gateway to the port of Mombasa where the majority of goods imported into Uganda and its neighbouring countries pass through. With challenges in the railway sector, the majority of goods imported into Uganda come by road.&nbsp;<\/p>\n\n\n\n<p>The URF funding for the Magamaga Weighbridge Station near Jinja sees at least 1,400 vehicles go through its gates each day. This ensures that only vehicles with acceptable loads use our roads to ensure that the lifespan of our roads is prolonged thereby reducing the money and other resources needed for road maintenance.&nbsp;<\/p>\n\n\n\n<p>\u201cWe, however, don\u2019t just limit ourselves to overloading, we ensure that what is loaded on these trucks even when it is within the allowable load is not dangerous to other road users,\u201d explains Eng Kiwalabye, the Magamaga Station Manager.&nbsp;<\/p>\n\n\n\n<p>It takes on average 40 minutes during heavy traffic hours for a truck to go through the weighbridge even though the actual weighing takes only a few minutes. To solve this problem, URF has provided financing for the construction of a second weighbridge at Magamaga to ease congestion.&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>One of the challenges of maintaining gravel roads in Mukono District is lack of axle-control yet the district given its<\/p>\n","protected":false},"author":1,"featured_media":2254,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[65],"tags":[],"class_list":["post-2253","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-national-news"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2020\/11\/weigh-bridge1556355240.jpg","jetpack-related-posts":[{"id":2226,"url":"https:\/\/prowebinhost.com\/anzu\/uganda-road-fund-more-than-a-decade-of-financing-road-maintenance\/","url_meta":{"origin":2253,"position":0},"title":"Uganda Road Fund \u2013 more than a decade of financing road maintenance","author":"UgandaUpdate","date":"November 13, 2020","format":false,"excerpt":"Over the years, the government of Uganda has prioritized the construction of highways to all the major towns in Uganda. Almost all major towns in the country are connected with a paved road, with gravel roads dominating the public road network.\u00a0 The infrastructure in municipalities and town councils has also\u2026","rel":"","context":"In &quot;National News&quot;","block_context":{"text":"National News","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-news\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2020\/11\/Outgoing-URF-ED-Michael-Odongo.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2020\/11\/Outgoing-URF-ED-Michael-Odongo.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2020\/11\/Outgoing-URF-ED-Michael-Odongo.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2020\/11\/Outgoing-URF-ED-Michael-Odongo.jpg 2x"},"classes":[]},{"id":4075,"url":"https:\/\/prowebinhost.com\/anzu\/lands-ministry-clarifies-on-118-1-kms-world-bank-funded-gravel-roads-in-hoima\/","url_meta":{"origin":2253,"position":1},"title":"LANDS  MINISTRY CLARIFIES ON 118.1 KMS WORLD BANK FUNDED GRAVEL ROADS IN HOIMA","author":"UgandaUpdate","date":"September 23, 2021","format":false,"excerpt":"By Our Reporters The Ministry of Lands ,Housing and Urban Development has dismissed as false press statements attributed to State Minister for Economic Monitoring, Hon Peter Ogwang, alleging that \u00a0118.1kms of gravel roads rehabilitated under a \u00a0World Bank funded successful project were \u201cshoddy\u201d and \u201cinflated the road length\u201d. In a\u2026","rel":"","context":"In &quot;Development&quot;","block_context":{"text":"Development","link":"https:\/\/prowebinhost.com\/anzu\/category\/development\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/09\/IMG-20210923-WA0013.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/09\/IMG-20210923-WA0013.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/09\/IMG-20210923-WA0013.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/09\/IMG-20210923-WA0013.jpg 2x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/09\/IMG-20210923-WA0013.jpg 3x"},"classes":[]},{"id":2263,"url":"https:\/\/prowebinhost.com\/anzu\/what-the-road-sector-needs-to-improve-maintenance\/","url_meta":{"origin":2253,"position":2},"title":"What the road sector needs to improve maintenance","author":"UgandaUpdate","date":"November 17, 2020","format":false,"excerpt":"It is not uncommon across the country to find a Boda Boda rider dragging iron bars and other such sharp objects on the road or somebody who stops along the main road and empties garbage in the drainage channels.\u00a0 Road maintenance in Uganda isn\u2019t facing only funding challenges. Bad road\u2026","rel":"","context":"In &quot;Road Sector&quot;","block_context":{"text":"Road Sector","link":"https:\/\/prowebinhost.com\/anzu\/category\/road-sector\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":14609,"url":"https:\/\/prowebinhost.com\/anzu\/budget-day-16-new-roads-to-be-tarmacked-across-uganda\/","url_meta":{"origin":2253,"position":3},"title":"Budget day :16 New Roads to be tarmacked across Uganda","author":"UgandaUpdate","date":"June 11, 2025","format":false,"excerpt":"The Government of Uganda has unveiled an ambitious and wide-ranging plan to upgrade the country\u2019s road infrastructure, with a particular focus on tarmacking and maintaining more than 1,160 kilometres of key national roads in the 2025\/26 financial year. This bold move reflects a renewed commitment to economic transformation, rural accessibility,\u2026","rel":"","context":"In &quot;National News&quot;","block_context":{"text":"National News","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-news\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/06\/Government-is-committed-to-keeping-Ugandas-road-network-in-good-condition.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/06\/Government-is-committed-to-keeping-Ugandas-road-network-in-good-condition.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/06\/Government-is-committed-to-keeping-Ugandas-road-network-in-good-condition.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/06\/Government-is-committed-to-keeping-Ugandas-road-network-in-good-condition.jpg 2x"},"classes":[]},{"id":2523,"url":"https:\/\/prowebinhost.com\/anzu\/museveni-at-ground-breaking-of-the-much-awaited-construction-of-kira-kasangati-matugga-road\/","url_meta":{"origin":2253,"position":4},"title":"MUSEVENI AT GROUND BREAKING OF THE MUCH AWAITED CONSTRUCTION OF KIRA -KASANGATI-MATUGGA ROAD","author":"UgandaUpdate","date":"December 30, 2020","format":false,"excerpt":"President Yoweri Museveni has presided over the much awaited ground-breaking ceremony for the construction of the Kira-Kasangati- Matugga ring road in Wakiso district. Gen. Museveni flanked by the Minister for Works and Transport, Gen. Edward Katumba Wamala, said the construction of the road will spur economic growth in the area\u2026","rel":"","context":"In &quot;Development&quot;","block_context":{"text":"Development","link":"https:\/\/prowebinhost.com\/anzu\/category\/development\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2020\/12\/kiira-rd.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2020\/12\/kiira-rd.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2020\/12\/kiira-rd.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2020\/12\/kiira-rd.jpg 2x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2020\/12\/kiira-rd.jpg 3x"},"classes":[]},{"id":9957,"url":"https:\/\/prowebinhost.com\/anzu\/cost-per-kilometer-as-a-unit-cost-of-a-road-is-misleading\/","url_meta":{"origin":2253,"position":5},"title":"COST PER KILOMETER AS A UNIT COST OF A ROAD IS MISLEADING","author":"UgandaUpdate","date":"September 19, 2023","format":false,"excerpt":"By Eng. Isaac Mutenyo (PhD) There has been continued reference to the large disparity in what many people refer to as the unit cost of roads or the cost per kilometer (km). The common observation referred to is that the unit cost of a road varies so much within and\u2026","rel":"","context":"In &quot;Road Construction&quot;","block_context":{"text":"Road Construction","link":"https:\/\/prowebinhost.com\/anzu\/category\/road-construction\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/09\/dr-isaac-scaled.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/09\/dr-isaac-scaled.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/09\/dr-isaac-scaled.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/09\/dr-isaac-scaled.jpg 2x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/09\/dr-isaac-scaled.jpg 3x"},"classes":[]}],"jetpack_shortlink":"https:\/\/wp.me\/pc0aOV-Al","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/2253","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/comments?post=2253"}],"version-history":[{"count":1,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/2253\/revisions"}],"predecessor-version":[{"id":2255,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/2253\/revisions\/2255"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/media\/2254"}],"wp:attachment":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/media?parent=2253"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/categories?post=2253"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/tags?post=2253"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}