{"id":1531,"date":"2020-07-25T12:32:34","date_gmt":"2020-07-25T12:32:34","guid":{"rendered":"https:\/\/ugandaupdatenews.com\/?p=1531"},"modified":"2020-07-26T18:57:29","modified_gmt":"2020-07-26T18:57:29","slug":"excitement-as-government-okays-west-nile-to-be-connected-to-the-national-grid","status":"publish","type":"post","link":"https:\/\/prowebinhost.com\/anzu\/excitement-as-government-okays-west-nile-to-be-connected-to-the-national-grid\/","title":{"rendered":"EXCITEMENT AS GOVERNMENT  OKAYS WEST NILE TO BE CONNECTED TO THE  NATIONAL GRID"},"content":{"rendered":"\n<p>As the elections season gathers momentum government has finalized plans to connect &nbsp;West Nile region to the national grid.&nbsp; Western nile is the only region which was yet to get electricity supply from the national grid even when the power generation capacity has been increased substantially .<\/p>\n\n\n\n<p>\u00a0Government \u00a0through <a class=\"rank-math-link\" href=\"https:\/\/www.uetcl.com\/\" target=\"_blank\" rel=\"noopener\">Uganda Electricity Transmission Company Limited<\/a> (UETCL) in partnership with Exim Bank of China have been undertaking the construction of a 600MW Hydro Power Plant at Karuma, which is nearly completion . <a href=\"https:\/\/en.wikipedia.org\/wiki\/Uganda_Electricity_Transmission_Company_Limited\" class=\"rank-math-link\" target=\"_blank\" rel=\"noopener\">UETCL<\/a> was mandated to construct interconnection system to evacuate power from Karuma and feed into the national grid.<\/p>\n\n\n\n<p>The increased capacity&nbsp; would then allow power supply and accessibility to northern Uganda &nbsp;including West Nile, Acholi, Lango and parts of Karamoja with a number of substations installed along the way &nbsp;.<\/p>\n\n\n\n<p>SMEC International PTY Ltd, Air Water Earth (AWE) and Associated Engineers &amp; Surveyors were deployed as consultants who prepared the Compensation and Resettlement&nbsp; Action Plan in the affected areas where the transmission&nbsp; lines had to pass to reach the desired destinations.<\/p>\n\n\n\n<p><br>Energy and Mineral Development&nbsp; Minister Gorreti Kitutu , represented President Yoweri Museveni at the signing ceremony and &nbsp;assured the people of West Nile through their Members of Parliament&nbsp; that government&nbsp; was &nbsp;commitment to have the region on the national grid to spur industrialization and job creation for the people.<\/p>\n\n\n\n<p>&nbsp;&#8221; We are resolved and focused on ensuring our brother and sisters who entrusted you to be their leaders see your hard work on this project&#8221; she noted. The singing ceremony was attended by State Minister for Energy Hon Simon Dujanga,<\/p>\n\n\n\n<p><strong>Pressure &nbsp;group for West Nile electricity<\/strong><\/p>\n\n\n\n<p>Ms. Evelyn Anite, State Minister for Privatization and Investment is the &nbsp;patron of Voice of West Nile Electricity Connectivity Committee, that &nbsp;was set up to lobby, coordinate and update on the&nbsp; progress of&nbsp; West Nile &nbsp;connectivity to the national grid.&nbsp; &nbsp;He Committee is chaired by city lawyer Caleb Alaka, Vice Chair, Arua businessman Jackson Lee Atima, who is the chair Chamber of Commerce Arua, Secretary General Mr. Adomati Dickson and Mr. Matua Job Richard a vibrant cadre of NRM government.<br>Anite thanked President Museveni for fulfilling his promises to the people of West Nile and Uganda at large. &#8220;If you remember he started with tarmac from Karuma to Oreba border, electricity although it has not been sufficient for the much needed investments, the Referral Hospital and now Arua City&#8221; she noted.<\/p>\n\n\n\n<p>The ongoing work to &nbsp;connect&nbsp; West nile to the national grid according to the chairman Board of Directors Uganda Electricity Transmission Company (UETCL), Dr. Ocanda, is expected to be completed within six months. The &nbsp;132KV power line will have four sub substations at Kole, Gulu, Nebbi and Arua.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As the elections season gathers momentum government has finalized plans to connect &nbsp;West Nile region to the national grid.&nbsp; Western<\/p>\n","protected":false},"author":2,"featured_media":1533,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[65],"tags":[],"class_list":["post-1531","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-national-news"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2020\/07\/energy-1.jpg","jetpack-related-posts":[{"id":12582,"url":"https:\/\/prowebinhost.com\/anzu\/west-nile-finally-connected-to-the-national-grid-as-the-long-standing-nrm-pledge-is-fulfilled\/","url_meta":{"origin":1531,"position":0},"title":"West Nile  Finally Connected To The National Grid As The Long Standing NRM Pledge Is Fulfilled","author":"UgandaUpdate","date":"August 6, 2024","format":false,"excerpt":"The historical NRA\/NRM government to connect the West Nile region to the national electricity grid has finally come to pass after President Museveni switched -on the 132kV Kole-Gulu-Nebbi-Arua transmission project which will evacuate electricity from Karuma, Agago and Nyagak dams to West Nile and parts of northern Uganda. It was\u2026","rel":"","context":"In &quot;Energy Sector&quot;","block_context":{"text":"Energy Sector","link":"https:\/\/prowebinhost.com\/anzu\/category\/energy-sector\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2024\/08\/1722757610987.webp","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2024\/08\/1722757610987.webp 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2024\/08\/1722757610987.webp 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2024\/08\/1722757610987.webp 2x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2024\/08\/1722757610987.webp 3x"},"classes":[]},{"id":4085,"url":"https:\/\/prowebinhost.com\/anzu\/energy-minister-nankabirwa-assures-ugandans-that-karuma-hydro-power-plant-will-be-commisioned-next-year-and-power-evacuated-to-west-nile-and-other-needy-regions\/","url_meta":{"origin":1531,"position":1},"title":"ENERGY MINISTER NANKABIRWA ASSURES UGANDANS THAT KARUMA HYDRO POWER PLANT WILL BE COMMISIONED NEXT YEAR AND POWER EVACUATED TO WEST NILE AND OTHER NEEDY REGIONS","author":"MOSES SSERWANGA","date":"September 24, 2021","format":false,"excerpt":"BY MOSES SSERWANGA In West Nile The Minister of Energy and Mineral Developments, Hon. Ruth Nankabirwa has assured \u00a0the country that the construction of the 600MW Karuma Hydro Power Plant \u00a0will completed and ready for \u00a0commissioning mid next year . Hon. Nankabirwa was also happy to note that the contractor\u2026","rel":"","context":"In &quot;National News&quot;","block_context":{"text":"National News","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-news\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":4045,"url":"https:\/\/prowebinhost.com\/anzu\/electricity-government-commits-to-connect-west-nile-to-national-grid-in-2022\/","url_meta":{"origin":1531,"position":2},"title":"ELECTRICITY : GOVERNMENT COMMITS TO CONNECT WEST NILE TO NATIONAL GRID IN 2022","author":"UgandaUpdate","date":"September 20, 2021","format":false,"excerpt":"Government is committed to have \u00a0West Nile region connected \u00a0to the \u00a0National Grid \u00a0next year as members of parliament assure their\u00a0 constituents\u00a0 following \u00a0President\u00a0 Yoweri \u00a0Museveni\u2019s directives and the subsequent \u00a0signing of a contract for the Kole-Gulu-Nebbi-Arua transmission line worth $100 millions and commissioning of \u00a0the Muni Sub station in\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/prowebinhost.com\/anzu\/category\/energy\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/09\/IMG-20210910-WA0241-1.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/09\/IMG-20210910-WA0241-1.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/09\/IMG-20210910-WA0241-1.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/09\/IMG-20210910-WA0241-1.jpg 2x"},"classes":[]},{"id":8753,"url":"https:\/\/prowebinhost.com\/anzu\/electricity-is-coming-to-west-nile-president-museveni-assures-wanaichi\/","url_meta":{"origin":1531,"position":3},"title":"Electricity is coming to West Nile -President Museveni assures wanaichi","author":"UgandaUpdate","date":"April 15, 2023","format":false,"excerpt":"President Yoweri Museveni has assured the people of western Nile that with Karuma dam getting connected to the national grid government is now constructing a powerline to transmit reliable electricity to the greater West Nile region. Museveni was has been on a three day working visit to the region to\u2026","rel":"","context":"In &quot;National Development&quot;","block_context":{"text":"National Development","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-development\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/04\/Obongi-Rally1-scaled-e1681476193800-750x375-1.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/04\/Obongi-Rally1-scaled-e1681476193800-750x375-1.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/04\/Obongi-Rally1-scaled-e1681476193800-750x375-1.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/04\/Obongi-Rally1-scaled-e1681476193800-750x375-1.jpg 2x"},"classes":[]},{"id":7850,"url":"https:\/\/prowebinhost.com\/anzu\/manufacturers-to-buy-electricity-directly-from-power-generators-energy-minister-nankabirwa\/","url_meta":{"origin":1531,"position":4},"title":"Manufacturers to buy electricity directly from power generators \u2013 Energy Minister Nankabirwa","author":"UgandaUpdate","date":"December 31, 2022","format":false,"excerpt":"By Sierra Ruth Arinaitwe The Minister of Energy and Mineral Development Hon Ruth Nankabirwa has announced that manufactures who qualify will be able to purchase electricity directly from the power generators effective January 2023. According to the minister, a tariff of 5 US Cents per kilowatt hour will be implemented\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/prowebinhost.com\/anzu\/category\/energy\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/12\/nanka.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/12\/nanka.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/12\/nanka.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/12\/nanka.jpg 2x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2022\/12\/nanka.jpg 3x"},"classes":[]},{"id":4094,"url":"https:\/\/prowebinhost.com\/anzu\/government-to-support-the-communities-affected-by-the-development-of-karuma-hydro-power-plant-in-a-30bn-action-plan-nankabirwa\/","url_meta":{"origin":1531,"position":5},"title":"GOVERNMENT TO SUPPORT THE COMMUNITIES AFFECTED BY THE DEVELOPMENT OF KARUMA HYDRO POWER PLANT IN A 30BN ACTION PLAN-NANKABIRWA","author":"UgandaUpdate","date":"September 24, 2021","format":false,"excerpt":"By Our Reporters in Nwoya Government will support the communities \u00a0displaced by the construction of the \u00a0Karuma Hydro Power Plant\u00a0 in Nwoya district Acholi\u00a0 sub region in a three year 30bn Community Development Action Plan (CDAP), Energy\u00a0 Minister Ruth Nankabirwa has announced . \u00a0\u201cThese large scale infrastructure developments, as you\u2026","rel":"","context":"In &quot;Development&quot;","block_context":{"text":"Development","link":"https:\/\/prowebinhost.com\/anzu\/category\/development\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"jetpack_shortlink":"https:\/\/wp.me\/pc0aOV-oH","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/1531","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/comments?post=1531"}],"version-history":[{"count":4,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/1531\/revisions"}],"predecessor-version":[{"id":1553,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/1531\/revisions\/1553"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/media\/1533"}],"wp:attachment":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/media?parent=1531"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/categories?post=1531"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/tags?post=1531"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}