{"id":14032,"date":"2025-03-12T16:34:30","date_gmt":"2025-03-12T16:34:30","guid":{"rendered":"https:\/\/ugandaupdatenews.com\/?p=14032"},"modified":"2025-03-12T16:35:04","modified_gmt":"2025-03-12T16:35:04","slug":"uganda-secures-ugx-340-billion-french-funding-for-kampala-water-infrastructure-development","status":"publish","type":"post","link":"https:\/\/prowebinhost.com\/anzu\/uganda-secures-ugx-340-billion-french-funding-for-kampala-water-infrastructure-development\/","title":{"rendered":"Uganda secures UGX 340 billion French funding for Kampala water, infrastructure development"},"content":{"rendered":"\n<p>Uganda has secured \u20ac85 million (approximately UGX 340 billion) in development aid from France to significantly improve both water infrastructure and broader urban development in the Greater Kampala Metropolitan Area (GKMA), Finance Minister Matia Kasaija announced Wednesday.<\/p>\n\n\n\n<p>The loans, signed by Mr. Kasaija and AFD Regional Director Jean-Fran\u00e7ois Arnal at the Ministry of Finance, Planning and Economic Development, solidify the ongoing partnership between Uganda and France, addressing critical needs in the rapidly expanding capital region.<\/p>\n\n\n\n<p>Minister Kasaija acknowledged the strain on Kampala&#8217;s water services due to rapid urbanization and industrial growth. &#8220;Water supply services in Kampala and surrounding areas have been constrained,&#8221; he stated, while highlighting progress made through existing collaborations.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"682\" data-attachment-id=\"14035\" data-permalink=\"https:\/\/prowebinhost.com\/anzu\/uganda-secures-ugx-340-billion-french-funding-for-kampala-water-infrastructure-development\/fina2\/\" data-orig-file=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina2.jpg\" data-orig-size=\"2560,1706\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"fina2\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina2.jpg\" data-large-file=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina2.jpg\" src=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina2-1024x682.jpg\" alt=\"\" class=\"wp-image-14035\" srcset=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina2.jpg 1024w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina2.jpg 300w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina2.jpg 768w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina2.jpg 1536w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina2.jpg 2048w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina2.jpg 1600w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina2.jpg 2400w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<p>Specifically, \u20ac45 million (approximately UGX 180 billion) of the total funding will support the second phase of the Kampala Water Lake Victoria Water and Sanitation Project. This will expand the water supply network, building upon previous phases that upgraded the Ggaba water treatment complex and constructed a new treatment plant at Katosi.<\/p>\n\n\n\n<p>&#8220;This funding will enable us to increase coverage of the intervention, develop the downstream part of the water supply network, and enhance access to safe water for the residents of the Greater Kampala Metropolitan Area,&#8221; Mr. Kasaija said. He reiterated the fundamental right to clean water and Uganda&#8217;s aim to achieve 100% piped water access by 2040.<\/p>\n\n\n\n<p>The remaining \u20ac40 million (approximately UGX 160 billion) will fund the Greater Kampala Metropolitan Area Urban Development Program, strengthening the capacity of the Ministry of Kampala Capital City and Metropolitan Affairs and the Kampala Capital City Authority to deliver coordinated infrastructure and services. This portion of the funding will focus on broader urban development needs beyond just water infrastructure.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"682\" data-attachment-id=\"14036\" data-permalink=\"https:\/\/prowebinhost.com\/anzu\/uganda-secures-ugx-340-billion-french-funding-for-kampala-water-infrastructure-development\/fina3\/\" data-orig-file=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina3.jpg\" data-orig-size=\"2560,1706\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"fina3\" data-image-description=\"\" data-image-caption=\"\" data-medium-file=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina3.jpg\" data-large-file=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina3.jpg\" src=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina3-1024x682.jpg\" alt=\"\" class=\"wp-image-14036\" srcset=\"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina3.jpg 1024w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina3.jpg 300w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina3.jpg 768w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina3.jpg 1536w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina3.jpg 2048w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina3.jpg 1600w, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina3.jpg 2400w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<p>Mr. Kasaija emphasized the timeliness of the funding, aligning with Uganda&#8217;s economic growth targets. &#8220;This financing is timely, as it fits into our strategic aspirations of growing the size of our economy tenfold from the current GDP of $53 billion to $500 billion by 2040,&#8221; he said, citing the GKMA&#8217;s significant contribution to the national economy.<\/p>\n\n\n\n<p>He pledged full accountability for the funds. &#8220;We will ensure that the funds are properly and exclusively utilized by the agencies for the activities earmarked,&#8221; he assured, adding that regular progress reports would be provided to development partners.<\/p>\n\n\n\n<p>Beatrice Anywar Atim, Minister of State for Environment, emphasized the importance of ensuring that water reaches the end-users, and the funding will support the expansion of the water network, restructuring, and rezoning. &#8220;We have water, but how do we make sure it reaches the end-users?&#8221; Minister Atim asked.<\/p>\n\n\n\n<p>The minister also expressed gratitude to international partners for their support and looks forward to expanding the partnership to other areas, including Masaka and beyond. &#8220;We are grateful for the support, but we are also looking forward to expanding our partnership to other areas, including Masaka and beyond.&#8221;<\/p>\n\n\n\n<p>Additionally, the Ugandan government has requested further funding of 150 million euros to support the expansion of clean water services.<\/p>\n\n\n\n<p>Minister Atim also emphasized the need for Ugandans to protect their water sources by avoiding activities that contaminate or destroy them. &#8220;I direct Ugandans to vacate wetlands&#8230; Let&#8217;s take responsibility to make sure that we protect our water sources, that we don&#8217;t dump, that we don&#8217;t contaminate our water source. Our water source is wealth that must be protected by all Ugandans. People should stop tampering with the catchment area of our water sources, including Lake Victoria. Let&#8217;s protect our environment. It sustains the water sources,\u201d she said.<\/p>\n\n\n\n<p>The \u20ac45 million soft loan will specifically fund the rehabilitation and extension of the water distribution network in North Kampala, benefiting an additional 1 million people, and include the installation of 2,600 prepaid meters in informal areas.<\/p>\n\n\n\n<p>&#8220;This project is a testament of the enduring and strong friendship and cooperation between our two countries,&#8221; said French Ambassador to Uganda, Xavier Sticker, highlighting France&#8217;s commitment to improving Uganda&#8217;s water supply through key investments and French expertise.<\/p>\n\n\n\n<p>AFD Regional Director Jean-Fran\u00e7ois Arnal emphasized the agency&#8217;s support for Uganda&#8217;s Vision 2040 and National Development Plan IV. &#8220;I am very honored, as AFD Regional Director, to come and sign the first AFD loans to the Government of Uganda since September 2021,&#8221; Arnal said, noting over \u20ac400 million in ongoing projects and \u20ac300 million in planned pipeline projects.<\/p>\n\n\n\n<p>Arnal also highlighted the importance of the urban development project, which will prioritize climate-resilient urban infrastructure investments. &#8220;Considering Uganda\u2019s location, the impact of climate change in urban areas are expected to manifest with an increase unpredictability of rainfall with more frequent and intense rainfall extremes that often result in floodings. The co-financing from AFD in form of \u20ac40m is prioritising urban infrastructure investments that build the resilience of the cities against these effects of climate change,&#8221; he said.<\/p>\n\n\n\n<p>The project, financed by AFD, will increase water production to 240 million liters per day, up from the current 160 million liters. The loan will be on-granted to the National Water and Sewerage Corporation (NWSC).<\/p>\n\n\n\n<p>NWSC Managing Director Eng. Dr. Silver Mugisha said the project aims to address water supply challenges. &#8220;When we finish Katosi, Sonde, and Naguru, we will have the capacity to produce sufficient water and bring it to the reservoirs,&#8221; he explained. &#8220;We need to increase production to 240 million liters per day, as the intake is 240 million liters per day, but the treatment plant can only handle 160 million liters.&#8221;<\/p>\n\n\n\n<p>Dr. Mugisha also mentioned plans for additional funding: \u20ac80 million (approximately UGX 320 billion) for Kampala, \u20ac34 million (approximately UGX 136 billion) for Masaka, and \u20ac44 million (approximately UGX 176 billion) for Bara, with AFD&#8217;s positive response pending presidential approval.<\/p>\n\n\n\n<p>He underscored the project&#8217;s significance in providing clean and sufficient water, particularly in areas like Kawempe. &#8220;This project will ensure that whoever is not getting water, especially in the north-eastern part of Kampala, will get sufficient water,&#8221; he said.<\/p>\n\n\n\n<p>The project scope includes the densification and extension of the water distribution network by approximately 71km of pipework, the construction of three new reservoirs, three booster stations, support facilities, and the extension of water services to 20 informal settlements. It also includes the installation of 2,500 prepaid meters and 1,450 public stand posts.<\/p>\n\n\n\n<p>Executed by Sogea Satom of France with supervision from Artelia and Gauff Consultants Uganda Limited, the project commenced on February 1, 2025, and is expected to be completed by August 1, 2027, benefiting over 3 million people in areas including Kira, Kasangati, Kanyanya, Gayaza Road, and Mutungo.<\/p>\n\n\n\n<p>The KW-LV WATSAN project, with \u20ac270 million (approximately UGX 1.08 trillion) in total AFD funding since 2010, aims to provide a pro-poor water utility system, supplying 450,000 people in informal settlements with new standpipes, school, and public toilets.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Uganda has secured \u20ac85 million (approximately UGX 340 billion) in development aid from France to significantly improve both water infrastructure<\/p>\n","protected":false},"author":1,"featured_media":14034,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[65],"tags":[],"class_list":["post-14032","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-national-news"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/fina.jpg","jetpack-related-posts":[{"id":14606,"url":"https:\/\/prowebinhost.com\/anzu\/postbank-to-change-name-to-pearl-bank\/","url_meta":{"origin":14032,"position":0},"title":"PostBank to change name to Pearl Bank","author":"UgandaUpdate","date":"June 11, 2025","format":false,"excerpt":"The shareholders of PostBank Uganda have approved a resolution to change the company's to Pearl Bank Uganda Limited, in a move aimed at aligning with the bank\u2019s strategic growth agenda and national pride. The rebrand is now subject to regulatory approval by the Bank of Uganda. This development was announced\u2026","rel":"","context":"In &quot;National News&quot;","block_context":{"text":"National News","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-news\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/06\/PostBank-AGM-2025.webp","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/06\/PostBank-AGM-2025.webp 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/06\/PostBank-AGM-2025.webp 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/06\/PostBank-AGM-2025.webp 2x"},"classes":[]},{"id":14139,"url":"https:\/\/prowebinhost.com\/anzu\/new-karuma-brdige-to-be-constructed-by-japan-at-ug-shs-121bn\/","url_meta":{"origin":14032,"position":1},"title":"New Karuma Brdige To Be Constructed By  Japan At Ug.Shs.121bn","author":"UgandaUpdate","date":"March 26, 2025","format":false,"excerpt":"Uganda's Finance Minister, Matia Kasaija, has signed a agreement with the Japanese government to reconstruct the Karuma Bridge at Ug.Shs. 121Bn. The signing ceremony was witnessed by Japanese Ambassador to Uganda,\u00a0 Sasayama Takuya, and JICA's Chief Representative, Mr. Inoue Yoichi. The New bridge at Karuma will feature modern, elevated structures\u2026","rel":"","context":"In &quot;National News&quot;","block_context":{"text":"National News","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-news\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/karu2.webp","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/karu2.webp 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2025\/03\/karu2.webp 1.5x"},"classes":[]},{"id":5789,"url":"https:\/\/prowebinhost.com\/anzu\/finance-minister-kasaija-admits-illegal-transfer-of-10-6-billion-blames-former-st-muhakanizi-as-mps-tell-him-to-resign%ef%bf%bc\/","url_meta":{"origin":14032,"position":2},"title":"Finance minister Kasaija admits illegal transfer of 10.6 billion, blames former ST Muhakanizi as MPs tell him to resign\ufffc","author":"UgandaUpdate","date":"June 1, 2022","format":false,"excerpt":"Finance minister Matia Kasaija has admitted to the Committee on Commissions, Statutory Authorities, and State enterprises \u2013 COSASE that his technical staff misled him to unlawfully approve a supplementary budget of Shillings 10.6 billion to offset six land claimants. The money ended up being abused, with some being paid to\u2026","rel":"","context":"In &quot;National News&quot;","block_context":{"text":"National News","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-news\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":9008,"url":"https:\/\/prowebinhost.com\/anzu\/uganda-grants-new-petroleum-exploration-license-for-turaco-block-signs-addendum-for-the-kanywataba-production-sharing-agreement\/","url_meta":{"origin":14032,"position":3},"title":"Uganda grants new petroleum exploration license for Turaco Block, signs addendum for the Kanywataba production sharing agreement","author":"UgandaUpdate","date":"May 13, 2023","format":false,"excerpt":"By Our Energy and Oil sector Reporter Uganda has gone ahead to grant\u00a0 another petroleum exploration license for Turaco Block and signed an addendum for the Kanywataba production sharing agreement for petroleum exploration , development and production. The signing ceremony between the government of Uganda through the Ministry of Energy\u2026","rel":"","context":"In &quot;National News&quot;","block_context":{"text":"National News","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-news\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/05\/naka-scaled.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/05\/naka-scaled.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/05\/naka-scaled.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/05\/naka-scaled.jpg 2x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/05\/naka-scaled.jpg 3x"},"classes":[]},{"id":1186,"url":"https:\/\/prowebinhost.com\/anzu\/kcca-should-partner-with-kiira-motors-to-supply-eco-buses\/","url_meta":{"origin":14032,"position":4},"title":"KCCA SHOULD PARTNER WITH KIIRA MOTORS TO SUPPLY  ECO-BUSES","author":"MOSES SSERWANGA","date":"May 16, 2020","format":false,"excerpt":"By MOSES SSERWANGA The Minister of Finance Matia Kasaija has presented\u00a0 a $ 12m (UGX 45bn) request to parliament\u2019s committee on the national economy to operationalise the Eco- bus\u00a0 project in Kampala central district . It is proposed that\u00a0special lanes be put in place for the Eco- (sic) electric and\u2026","rel":"","context":"In &quot;Innovation&quot;","block_context":{"text":"Innovation","link":"https:\/\/prowebinhost.com\/anzu\/category\/innovation\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2020\/05\/2-Minister-Elioda-Tumwesigye.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2020\/05\/2-Minister-Elioda-Tumwesigye.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2020\/05\/2-Minister-Elioda-Tumwesigye.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2020\/05\/2-Minister-Elioda-Tumwesigye.jpg 2x"},"classes":[]}],"jetpack_shortlink":"https:\/\/wp.me\/pc0aOV-3Ek","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/14032","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/comments?post=14032"}],"version-history":[{"count":1,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/14032\/revisions"}],"predecessor-version":[{"id":14037,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/14032\/revisions\/14037"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/media\/14034"}],"wp:attachment":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/media?parent=14032"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/categories?post=14032"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/tags?post=14032"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}