{"id":10929,"date":"2023-12-15T13:18:25","date_gmt":"2023-12-15T13:18:25","guid":{"rendered":"https:\/\/ugandaupdatenews.com\/?p=10929"},"modified":"2023-12-15T13:18:34","modified_gmt":"2023-12-15T13:18:34","slug":"new-katonga-steel-bridge-along-kampala-masaka-highway-opens-to-traffic","status":"publish","type":"post","link":"https:\/\/prowebinhost.com\/anzu\/new-katonga-steel-bridge-along-kampala-masaka-highway-opens-to-traffic\/","title":{"rendered":"New Katonga Steel Bridge along Kampala-Masaka Highway opens to traffic"},"content":{"rendered":"\n<p>Government through Uganda National Roads Authority (UNRA) has constructed a  temporary 100 meters steel bridge at  Katonga along the Kampala-Masaka Highway as traffic is expected to pick during the charismas festive season .<\/p>\n\n\n\n<p> Vehicles including heavy trucks are now allowed to use the bridge which was washed away when the river burst its banks .<\/p>\n\n\n\n<p>Eng. Samuel Muhoozi, the Director of Roads and Bridge Development at the Uganda National Roads Authority \u2013 UNRA, said that the temporary bridge is designed to carry loads  not exceeding 60 tonnes at any given time.<\/p>\n\n\n\n<p>Severe floods in May this year washed away the bridge that led to the closure of the busy highway  causing substantial  difficulties in travel to western Uganda, disrupted trade, and commerce.<\/p>\n\n\n\n<p>Motorists were forced to use the long Mpigi-Butambala-Ssembabule  routes increasing transport and food costs.<\/p>\n\n\n\n<p>Recently the Minister of Works and Transport Gen. Katumba Wamala said that government has designed a new strong bridge that is going to be constructed at Katonga. China Communications Construction Company \u2013 CCC Ltd has since been contracted to construct a temporary steel bridge at Katonga River. <\/p>\n\n\n\n<p>Eng. Muhoozi stated that the reconstruction of the Katonga Bridge will last  two years.<\/p>\n\n\n\n<p><strong>Editor;msserwanga@gmail.com<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Government through Uganda National Roads Authority (UNRA) has constructed a temporary 100 meters steel bridge at Katonga along the Kampala-Masaka<\/p>\n","protected":false},"author":1,"featured_media":10930,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[65],"tags":[],"class_list":["post-10929","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-national-news"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/12\/GBXoqMgXEAE0ZTD.jpeg","jetpack-related-posts":[{"id":2935,"url":"https:\/\/prowebinhost.com\/anzu\/easter-traffic-to-western-uganda-blocked-as-highway-collapses\/","url_meta":{"origin":10929,"position":0},"title":"Easter Traffic to Western Uganda blocked as Highway Collapses","author":"UgandaUpdate","date":"April 1, 2021","format":false,"excerpt":"Just as many\u00a0Ugandans are setting off for the long Easter\u00a0 weekend to different destinations, those heading to Western Uganda are having their plans messed up by the collapse of the highway at Lwera wetland which occurred on Wednesday night. The collapsed\u00a0section lies on the Kampala - Masaka highway between Mpigi\u2026","rel":"","context":"In &quot;Breaking News&quot;","block_context":{"text":"Breaking News","link":"https:\/\/prowebinhost.com\/anzu\/category\/breaking-news\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/04\/Masaka-road-lwera-unra.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/04\/Masaka-road-lwera-unra.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/04\/Masaka-road-lwera-unra.jpg 1.5x"},"classes":[]},{"id":3482,"url":"https:\/\/prowebinhost.com\/anzu\/museveni-tshisekedi-to-launch-mpondwe-bridge-flag-off-the-construction-of-the-eastern-dr-congo-roads-by-ugandan-companies\/","url_meta":{"origin":10929,"position":1},"title":"Museveni, Tshisekedi to launch Mpondwe bridge, flag -off the Construction of the Eastern DR.Congo roads by Ugandan companies","author":"UgandaUpdate","date":"June 16, 2021","format":false,"excerpt":"President Museveni and his DR Congo counterpart, Felix Tshisekedi\u00a0 are in Kasese to launch the Mpondwe bridge and and attend the ground breaking ceremony to upgrade the \u2018economic\u201d roads in eastern DR Congo. The multi-billion construction works will be undertaken by Ugandan companies including Dott Service Ltd. Already logistical and\u2026","rel":"","context":"In &quot;EAC Regional News&quot;","block_context":{"text":"EAC Regional News","link":"https:\/\/prowebinhost.com\/anzu\/category\/eac-regional-news\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/06\/IMG-20210616-WA0076.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/06\/IMG-20210616-WA0076.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/06\/IMG-20210616-WA0076.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2021\/06\/IMG-20210616-WA0076.jpg 2x"},"classes":[]},{"id":10870,"url":"https:\/\/prowebinhost.com\/anzu\/govt-to-construct-new-pakwach-bridge-minister-katumba-wamala\/","url_meta":{"origin":10929,"position":2},"title":"Gov\u2019t to construct new Pakwach bridge- Minister Katumba Wamala","author":"UgandaUpdate","date":"December 7, 2023","format":false,"excerpt":"The government is to construct a new bridge on Albert Nile in Pakwach district to tackle persistent floods. The proposed new bridge will replace the current Pakwach bridge which was built in the 1960s to connect the railway to the West Nile region. The bridge has since developed several cracks.\u2026","rel":"","context":"In &quot;National News&quot;","block_context":{"text":"National News","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-news\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/12\/th.jpg","width":350,"height":200},"classes":[]},{"id":2226,"url":"https:\/\/prowebinhost.com\/anzu\/uganda-road-fund-more-than-a-decade-of-financing-road-maintenance\/","url_meta":{"origin":10929,"position":3},"title":"Uganda Road Fund \u2013 more than a decade of financing road maintenance","author":"UgandaUpdate","date":"November 13, 2020","format":false,"excerpt":"Over the years, the government of Uganda has prioritized the construction of highways to all the major towns in Uganda. Almost all major towns in the country are connected with a paved road, with gravel roads dominating the public road network.\u00a0 The infrastructure in municipalities and town councils has also\u2026","rel":"","context":"In &quot;National News&quot;","block_context":{"text":"National News","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-news\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2020\/11\/Outgoing-URF-ED-Michael-Odongo.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2020\/11\/Outgoing-URF-ED-Michael-Odongo.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2020\/11\/Outgoing-URF-ED-Michael-Odongo.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2020\/11\/Outgoing-URF-ED-Michael-Odongo.jpg 2x"},"classes":[]},{"id":11032,"url":"https:\/\/prowebinhost.com\/anzu\/unra-dispatches-equipment-to-clear-weed-around-pakwach-bridge\/","url_meta":{"origin":10929,"position":4},"title":"UNRA Dispatches Equipment To Clear Weed Around Pakwach Bridge","author":"UgandaUpdate","date":"December 26, 2023","format":false,"excerpt":"\u00a0A fleet of equipment has been dispatched to Pakwach bridge as an intervention to prevent possible cut off and damage to the bridge following a collection of floating vegetation around the bridge. This after Uganda National Road Authority (UNRA) warned travelers to be cautious of a massive cluster of a\u2026","rel":"","context":"In &quot;National News&quot;","block_context":{"text":"National News","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-news\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/12\/wat.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/12\/wat.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/12\/wat.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/12\/wat.jpg 2x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/12\/wat.jpg 3x"},"classes":[]},{"id":7968,"url":"https:\/\/prowebinhost.com\/anzu\/clock-tower-junction-to-be-closed-for-two-months-from-january-14th-to-march-14th\/","url_meta":{"origin":10929,"position":5},"title":"CLOCK TOWER JUNCTION TO BE CLOSED FOR TWO MONTHS FROM JANUARY 14th TO MARCH 14th","author":"UgandaUpdate","date":"January 10, 2023","format":false,"excerpt":"Uganda National Roads Authority has announced plans to divert traffic from the clock tower junction along Entebbe road for two months starting January 14th up to March 14th, 2023. UNRA has since advised motorists from Entebbe to use the Lubiri Ring road and Lubaga road to access the city center.\u2026","rel":"","context":"In &quot;National News&quot;","block_context":{"text":"National News","link":"https:\/\/prowebinhost.com\/anzu\/category\/national-news\/"},"img":{"alt_text":"","src":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/01\/IMG-20230110-WA0148.jpg","width":350,"height":200,"srcset":"https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/01\/IMG-20230110-WA0148.jpg 1x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/01\/IMG-20230110-WA0148.jpg 1.5x, https:\/\/prowebinhost.com\/anzu\/wp-content\/uploads\/2023\/01\/IMG-20230110-WA0148.jpg 2x"},"classes":[]}],"jetpack_shortlink":"https:\/\/wp.me\/pc0aOV-2Qh","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/10929","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/comments?post=10929"}],"version-history":[{"count":1,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/10929\/revisions"}],"predecessor-version":[{"id":10931,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/posts\/10929\/revisions\/10931"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/media\/10930"}],"wp:attachment":[{"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/media?parent=10929"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/categories?post=10929"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/prowebinhost.com\/anzu\/wp-json\/wp\/v2\/tags?post=10929"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}